Industries

Flooring: Square-footage quotes with subfloor honesty

Material, waste factor, subfloor prep and furniture handling calculated per room and totalled for the whole job.

50 free credits · roughly six proposals · no card required

Pricing lines already in the template

  • Material + waste factor
  • Removal & disposal
  • Subfloor levelling
  • Installation labour
  • Transitions & trim

What the generated document contains

  1. 1Room-by-room measurements
  2. 2Material specification
  3. 3Subfloor contingency
  4. 4Schedule
  5. 5Signature

The objection this trade hears most

"What if the subfloor is bad?"

A levelling contingency with a stated unit rate is included in every quote, so surprises are already priced.

Step 1

Describe the job

Paste site notes or type a few lines. No template hunting.

Step 2

AI drafts it

A full flooring document in about 30 seconds, 8 credits.

Step 3

Send and get signed

Client reviews, e-signs and pays a deposit from the same link.

Quote your next flooring job today

50 free credits. No credit card. 60-day money-back guarantee on paid plans.